Pavement Management

Burlington’s Philosophy of Pavement Management

Apply the proper surface treatment at the appropriate time to maintain and extend the service life of street pavement.

System Overview

The Pavement Management System is a tool to inventory the physical road network, determine pavement conditions, and develop a method for prioritizing pavement restoration. The Engineering Division developed this system and maintains the pavement condition data on an annual basis.

Paving Moratorium Streets

In accordance with the Town of Burlington  “Street Opening/Utility Connection Rules and Regulations", no street opening permits shall be issued on newly  constructed/paved roads for a period of five years after the roadway is constructed or paved.


 Documents